Week 12 - We are open plan!

6/5/2016

0 Comments

 
This week there weren't many dramatic changes to the exterior. The ground floor deck structure was finished and concreted in. The weatherboard was removed from our old kitchen upstairs, which will be extended to become our master bedroom.

When we were raising the house, the bathroom on the right side (in the old sleep out) was not structurally sound, so it came down. The floor framing for that room went in this week, we are rebuilding that bathroom as it was, which is a condition on our development approval. It will probably be the only room with level floors!

Inside some changes were made - the interior VJ walls came down, so we now have an idea of what our open plan living/dining will be like. There are posts still (to hold up the roof) but we can now see the space. There is a large hole in the floor where our staircase was, which is being filled in. It's very dusty inside!!!
0 Comments



Leave a Reply.

    Matt Savage


    RSS Feed

    Archives

    October 2021
    July 2020
    March 2020
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    December 2013
    November 2013

  • Marriott Street Renovation
  • About us