This week the colorbond roofing went on to the front study, and the side bathroom. The study is in an old enclosed porch, and the bathroom in an old sleep-out (typical of Queenslanders), so these two areas are not under the main roof.

We prefer the look of the bathroom roof (with the 3 pitch directions) and wish we had done that to the study too, but they're so tall nobody will ever see the top of them again. One of those cost-saving decisions we will just have to live with!

The plumbing rough-in happened, so the walls and ceilings are now full of pipes. We tried to take photos to avoid nailing through a water line when we hang artwork in a few months. This means that once the windows are delivered and installed - we will be ready for weatherboard cladding, electrical rough-in, air conditioning and internal linings!
0 Comments



Leave a Reply.

    Matt Savage


    RSS Feed

    Archives

    October 2021
    July 2020
    March 2020
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    December 2013
    November 2013

  • Marriott Street Renovation
  • About us