Week 40 - Countdown is on - 3 weeks to go

20/11/2016

1 Comment

 
It's really getting down to the wire now! Every day is is slowly starting to feel like the small jobs are being ticked off the list. This week the splashback tile was installed and grouted, air-conditioning vents were installed and built-in wardrobes were fitted out with shelves & drawers,

Outside the front fence was finished, but we are still waiting on the big sliding car gate. This is specially made so it's coming from another contractor to match the rest of the fence. The major carpentry work this week was on the backs steps, which are all but finished.

There was a tiny bit of progress on the pool - with the mosaic tiles installed to highlight the edge of each step. The pool is now ready to be rendered. Above the pool however is another story - the pergola is up, and is just waiting on the decorative concrete columns to finish it off.

The hot water system is in - so we could take a nice hot shower (if only Origin could get organised and get our gas meter installed). The rest of the driveway was poured and stamped, and so now the only concreting left is the small bridge piece over the front gutter. We made our driveway wider, so this had to be extended.
1 Comment
Michael Ross link
15/11/2022 12:42:27 am

Resource president several rather may mouth tonight. Old whom skill increase attorney democratic. Teach eight better service fire focus.

Reply



Leave a Reply.

    Matt Savage


    RSS Feed

    Archives

    October 2021
    July 2020
    March 2020
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    December 2013
    November 2013

  • Marriott Street Renovation
  • About us